
The Project
Steelwork & Filter
Scope of work:
Hiiroc is committed to decarbonising the global energy system and combating global warming through the production of clean Hydrogen.
As part of this process, Richard Alan was tasked to remove old steelwork and a vessel and replace it with new structural steelwork along with a new filter unit.
Richard Alan designed, manufactured and installed the equipment on HiiROC’s site in North Lincolnshire.
Specification
- Filter Vessel
- Structural Steelwork
- Design and fabrication of a support system for the filter
- Steelwork loading calculations
Get In Touch
Want to know more about what we offer? Got a specific project you’d like to discuss? Then we’d really like to hear from you! Call us on: +44 (0)1924 467040 or contact us online using the button on the right